Skip to content
Contents ↓
Chapter 17

Glossary

The words this guide uses, in alphabetical order. Labels in Andon's interface are shown in bold.

TermMeaning
AndonA signal light on a factory assembly line that shows whether a station runs normally or needs help. The app is named after it.
ArchiveWhere finished or paused projects go. Archived projects keep everything and remain searchable. See chapter 11.
BackupsCopies of Andon's databases, made in the backups subfolder the first time a new version starts. The three most recent are kept. See chapters 2 and 15.
BecomesThe Yi Jing page showing the hexagram a cast turns into once its moving lines change: where the situation is heading. See chapter 14.
BranchA project created from tasks of another project with Branch into new project…. The branched tasks are shared between the two projects, not copied. See chapter 12.
BreadcrumbThe bar at the top of the window when a task is open: project › parent tasks › task. Click a name to open it, or a › to list the tasks at that level. See chapter 5.
Calculated colorThe color Andon works out for a task with children, a project, a todo list, a Kanban board or a Kanban card, from the colors below it. See chapter 6.
CardAn item on a Kanban board. It moves through the board's stages as its DoD steps are completed, and has its own notes and subtasks. See chapter 10.
CheckpointA version of a note saved with Ctrl+S or Save. Marked SAVED in the history and never removed automatically. See chapter 8.
Child taskA task placed under another task. The app also says Subtasks in the Compare tab and on Kanban cards.
Chocolate BoxThe icon view of the project list: one colored square per project. See chapter 5.
CompareA tab that shows several selected tasks side by side. See chapter 9.
Data folderThe folder holding all of Andon's data: %AppData%\Andon on Windows, ~/.config/Andon on Linux. See chapter 2.
Definition of Done (DoD)The list of steps a Kanban card must complete, each tied to a stage. The card's stage follows its steps. See chapter 10.
DoD stepOne step of a card's Definition of Done, tied to a stage and set to To do, NTR (done), Blocked or Canceled. See chapter 10.
FolderA display-only group in the Tasks tab, for tidying long lists. Folders change neither hierarchy nor colors, and each project has its own. See chapter 6.
HexagramA figure of six solid or broken lines. The Yi Jing has 64, each describing a typical moment of change. See chapter 14.
Kanban boardA board of cards moving through stages, created from a profile. Shown with a board icon in the task list. See chapter 10.
Kanban profileA reusable template of stages, WIP limits and DoD steps, such as Dev or Ops.
Markdown sync (MD sync)Turning a folder of .md files into tasks, and updating them on each sync. See chapter 9.
Modified dateWhen a task last really changed: its name, description, color, notes or files, or a new child task. Shown in the Tasks tab and in Compare. See chapter 6.
Moving lineIn a Yi Jing cast, an old yin or old yang line: unstable, about to turn into its opposite. Moving lines show where the change sits. See chapter 14.
Note historyThe automatically kept earlier versions of a note. See chapter 8.
NTRNothing To Report: the label of green, meaning no problem, the flow is going. RAS in French. On a Kanban step it means done. See chapters 3 and 10.
Past readingsThe list of a task's earlier Yi Jing casts, each with its date, time and question. See chapter 14.
PluginAn add-on installed from the Plugin Manager that adds a tab to every task, such as Yi Jing or draw.io. See chapter 14.
Plugin ManagerThe window, opened from Preferences, where plugins are installed, updated or uninstalled. See chapter 14.
PropertiesThe window, opened by right-clicking a task, that keeps the reasons for its color: Current shows the fields of its state, History every state it has been in. See chapter 6.
Recovery windowThe window Andon opens after a failed start, offering to restore a backup or start anyway. See chapter 15.
Red taskA task set to red (Called off): a route that is going nowhere, set aside with its reasons to be taken up again in another context. See chapter 3.
Shared taskA task held by more than one project, after branching. Its color, child tasks, notes and files are the same everywhere; it shows the ⑂ marker. See chapter 12.
Signal buttonThe small button after the status dot of an orange or red task whose reason is not written yet. Click it to write it; it goes away once written. See chapter 6.
StageA column of a Kanban board, such as Backlog or Review. A card's stage follows its DoD steps. See chapter 10.
Status dotThe colored dot on a task's row, after its type icon. Click it to set the color of a plain task. In light themes, white shows as an empty ring.
Todo listA simple checklist in the task list, whose items each have a status color. Shown with a checklist icon. See chapter 10.
WIP limitWork-in-progress limit: the most cards a Kanban stage should hold at once.
⑂ markerThe sign on a shared task's row, followed by dots in the colors of the other projects that hold it. Click it to jump there. See chapter 12.